Consolidated Power Projects was the main contractor. Riverfox was subcontracted for the survey and design of the earthing and lightning protection systems.
The brief
What Consolidated Power Projects needed
Consolidated Power Projects needed complete earthing and lightning protection systems surveyed and designed for two substations in Eswatini: Siteki and Siphofaneni.
Scope
What Riverfox delivered
- Survey of the Siteki substation site
- Survey of the Siphofaneni substation site
- Design of the complete earthing system for each substation
- Design of the lightning protection system for each substation
Background
Why substation earthing matters
A substation earth grid carries fault current and lightning current safely into the ground. It keeps step and touch voltages within safe limits for people working on site and protects the equipment.
Riverfox designs earth grids for substations and facilities, and works to LPS Level 1, 2 and 3 and to Eskom standards.
About our earthing & lightning protection work